
Measurement System Analysis
What is MSA?
A Measurement system is a process by which we assign a number to a characteristic
of a product or service. The first step in assessing a system is to understand this
process, and determine whether it will satisfy our requirements.
Measurement System Analysis, often referred to as MSA, is used to assess the statistical
properties of process measurement systems.
- MSA primarily deals with analyzing the effect of the measurement system on the measured
value in quantifiable terms
- Emphasis is on the effect due to equipment and personnel
- We test the system to determine the numerical values of its statistical properties
and compare them to accepted standards. It is a process used to standardize the
methods of analysis to ensure and demonstrate that your measuring systems have adequate
resolution, do not excessively bias results, and possess a small variability in
comparison with specified tolerances. It helps you assess, monitor, and reduce measurement
system variation. The objective of a measurement system analysis study is to make
sure that your measurement system - gages, methods, and procedures are stable and
capable of measuring data, before continuing with your process improvement efforts.
It ensures that your measuring procedures and systems provide:
- Adequate resolution
- Results that are not unduly biased, and
- Little variability in comparison with specified tolerances
Fundamental Issues
To evaluate a measurement system determine:
- If it has adequate discrimination
- If it is statistically stable over time
- If statistical properties are consistent over the expected range and acceptable
for process analysis or control
- If the sum of all variables is an acceptable level of measurement uncertainty
Overall Objective of MSA
Uncertainty of Measurement
It is the range within which the true value of a characteristic is estimated to
lie. Such data can be expressed as the statistical distribution of a series of measurements,
standard deviations, probability, percentages, and error as the difference between
actual value minus the true value, as points on a control chart or diagram.
Best-in-Class Approach
- Determining these fundamental issues are most meaningful if made relative to process
variation
- Reporting measurement error as only percent of tolerance is inadequate for the worldwide
market where emphasis is on continual process improvement
Use of Data in Measurement System Studies
The data collected using a measurement system is used:
- To control process
- In estimating the existence of relationship between variables that can affect the
outcome of a process
- To conduct analytical studies to increase the knowledge about the system of causes
and its effect on processes
- To focus on measurement systems where readings can be repeated on each part, and
reproduced by different operators.
A measurement is not always exact. Measurement system variation affects individual
measurements and decisions based on data. Measurement system errors are classified
into five categories: bias, repeatability, reproducibility, stability, and linearity.
You need to know the extent of variation before deciding on the following applications.
MSA Applications
- Establish criteria for suitability and acceptability of new measuring equipment
- Compare one measuring device against another
- Evaluate suspect equipment
- Compare the performance of an equipment before and after its repair
- Calculate measurement system variation
- Establish acceptability of manufacturing process
- Manage & improve the measurement process
Where to start?
- Evaluate the components of the measuring system, and control the variation in them
as much as possible to ensure that an item of measuring equipment complies with
the requirements for its intended use
- Expand your consideration of Measurement Process Variation to Measurement System
Statistical Properties & Measurement Uncertainty.
- Follow the basics of SPC.
Process Accuracy Measurements
Stability
Stability (or drift) is total variation in measurements obtained with a measurement
system on same master or parts when measuring a single characteristic over an extended
time period (a time period is days, not hours). Stability is the key to predictability.
Stable processes are those that are free from special cause variation. In terms
of measuring equipment, stability is determined by using a control chart. As measurements
are taken, points within the limits indicate that the process has not changed and
the prediction is made that it is not likely to change in the future. Statistical
process control (SPC), scatter plots, or other forms of statistical analysis are
used to measure process stability.
Linearity
Linearity is the difference in the accuracy values through the expected operating
range of the equipment. Selecting the parts throughout the operating range of the
instrument can determine the linearity. The accuracy of these parts is determined
by the difference between the master measurement and the observed average measurement.
Bias
Difference between observed average of measurements and reference value. The reference
value, also known as accepted reference value or master value, is a value that serves
as an agreed upon reference for measured values. A reference value can be determined
by averaging several measurements with a higher level of measuring equipment.
Process Precision Measurements
Gage R&R
Gage R&R statistically isolates different types of variation in the measurement
process. These types of variation include:
- Repeatability = equipment variation = within variation
- Reproducibility = appraiser variation = between variation
- Residual or pure error
- Variation due to interaction effects. For example, out of several inspectors, one
might have a tendency to read one gage differently than others.
Gage R&R- Gage Repeatability and Reproducibility can be applied to any kind of measurement
(attribute or variables, indeterminate or determinate). The two most common methods
used and supported by statistical software are the ANOVA method (Analysis Of Variance)
and the average and range method.
Repeatability refers to the variation in measurements obtained with one measurement
instrument when used several times by one assessor while measuring the identical
characteristics on the same part.
Reproducibility refers to the variation in the average of measurements made by different
assessors using the same measuring instrument while measuring the identical characteristics
on the same part.
R&R is the combination of repeatability and reproducibility variation, and is considered
as the total measurement variation excluding within part variation and variation
in central location.
Reference Material
A material or substance with one or more properties, which are sufficiently well
established to be used for the calibration of an apparatus, assessment of a measurement
method, or for assigning values to materials.
Measurement Uncertainty
- Measurement Uncertainty is the sum of all the probabilities (percents) assigned
to the variables that make up the measurement system.
- The total of these probabilities should be weighed, and carry importance in proportion
to the seriousness, and criticality of the measurements being made.
- Decisions resulting from measurement system analysis include:
- Using the system as is, taking into account its uncertainty.
- Improving the system to control the variation in the contributing factors.
- Considering other measurement systems of higher levels of discrimination and capability.
Product and process conformance are determined by the measurements taken by a measurement
system. If the measuring process is changing over time, the ability to use the data
gathered in making decisions is reduced. In essence, establishing the adequacy of
your measurement system using a measurement system analysis process is fundamental
to measuring your own business process capability, and meeting the needs of your
customer.

|

Latest News
ISO 26262 Training for Automotive Hardware and Software Safety Coming to the U.S.
A new upcoming standard (ISO 26262 - Road Vehicles - Functional Safety) was developed to comply with the needs specific to the application sector of E/E systems within motor vehicles. This standard is currently available as an FDIS in 10 parts and is already being applied worldwide in order to develop safe vehicles. It is expected to be released as a formally accepted ISO standard later this year, and is expected to become a mandate for European Automobiles. Click Here
Omnex is now a PMI (Project Management Institute) Global R.E.P
Omnex Inc. announces it is now approved by Project Management Institute as a PMI Registered Education Provider (R.E.P.) effective May 01, 2010. Omnex plans to launch the PMP Classroom program in several cities and countries with immediate effect, followed by the PgMP and RMP courses that will be launched soon. Click here for more information.
 |